Case study · Multi-artist mural programme
Aldar
Murals
Yas Island
Abu Dhabi, UAE
Completed
February 2022
The commission
Six façades.
Six distinct voices.
Gallery Dod coordinated six individual artists to create a family of large-scale murals across six Aldar buildings on Yas Island. Each artist brought a different visual language; the production had to give every work its own presence while holding the complete site together.
Across otherwise standard façade surfaces, the six works required a mixed material specification. The remit covered feasibility, design consultation, condition reporting, surface and material planning, programming, access, site safety, artist and crew coordination, execution and handover. Approximately two assistants supported each commissioned artist.
- Client
- Aldar
- Delivery partner
- XLer8 AD
- Format
- Six-artist façade programme
The completed collection
One site.
Six visual languages.
No two façades were treated as a variation of the same idea. The programme preserved the individual character of each artist while giving the architecture a shared sense of ambition and scale.






The production challenge
Six parallel
workstreams.
The defining complexity was coordination. Six artists, approximately twelve assistants, separate material needs and six active façades had to move through one controlled production programme.
Gallery Dod connected the creative, technical and operational decisions so individual artistic approaches could progress without the site losing clarity, pace or control.


Artworks across architecture
Different by design.
Consistent in delivery.
The programme moved between distinct palettes, mark-making and material requirements. Consistency came from the planning behind the work: common standards for access, safety, surfaces, scheduling and handover.
Across the siteTwo façades · one delivery standard

Suspended access
At height,
the plan is the platform.
Each 6-by-26-metre surface was delivered from suspended access. Equipment planning, daily sequencing, surface preparation, materials and crew movement were managed as part of the creative programme, not around it.



Aldar Murals · Yas Island
Six commissions.
One finished environment.
Planning a multi-artist programme?